Single Minute Exchange of Dies (SMED)


Single Minute Exchange of Dies (SMED) in other words means a changeover taking less than ten minutes. Although the term is quite intriguing, especially when it comes to machines where changeover takes several hours, it should be translated rather as an indication of the huge potential of reducing the time needed for changeovers.
Changeover is defined as the time period between stopping a machine after it has manufactured the last good piece from a previous batch and turning on the machine for manufacturing the first good piece from the next batch.
Changeover involves two types of procedures. These are external and internal procedures. External procedures include everything we do during a changeover without having to stop the machine. Internal procedures are everything we do after stopping the machine. This is one of the assumptions underlying SMED.
Very often Formula 1 pit crews are given as an example of an ideal changeover, where changing of tires is planned with surgical precision and lasts only a few seconds.
The changeover analysis process consists of 4 stages
Stage 1 – Differentiation between external and internal procedures This is best done by video recording the entire process. Next, a changeover map is created, where each observed action is identified and assigned an external or internal procedure status. At this stage you can already notice some procedures which, being evident losses, should be eliminated from the process, e.g., repeatedly returning to the same point. 
Stage 2 – Separation of external set-ups from internal set-ups At this stage you must decide what can be done while the machine is still producing items from the previous production batch. For example, you can collect all tools, dies, etc. required for the production of a new product batch. In this way after stopping the machine you are sure you have at hand everything needed for changeover. 
Stage 3 – Replacing an internal set-up with an external set-up Question every internal procedure to see whether it could be replaced with an external one. In other words, think how to do certain operations while the machine is still running. Define the “real functions and goals” of each step to encourage staff to generate ideas helping to eliminate, simplify or replace internal procedures with external ones. The separation of these procedures can often reduce the changeover/set-up time by 30-50%. 
Stage 4 – Differentiation between external and internal set-ups All machine parts should be self-locking. For example, you can use a system of openings and plugs/pivots to place a specific part in the machine. Flexible clamps or plugs/pivots in this case can be used to keep the part in the required position. All adjustments must be done in terms of value (that is, set-up in accordance with a given value) in contrast to quality adjustments (that is, carried out on the basis of a feeling, intuition or experience) in order to achieve repeatability. Consistent use of the same set-ups helps to avoid additional adjustments after line start-up.